ADU construction is where a good plan either becomes a great home or an expensive lesson. H&A My Design is a licensed design-build general contractor, family-owned for more than 20 years, with our own project managers running every site from foundation to final inspection. Serving Southern California and the surrounding areas.

Licensed & bonded California general contractor — CSLB #999603. Fixed, property-specific proposals after a free on-site audit.

The Build

What ADU Construction Involves From Start To Finish

An accessory dwelling unit is a small house, and it is built like one: foundation, framing, roofing, plumbing, electrical, mechanical, insulation, drywall and finishes, each inspected before the next can start. The difference is that it happens a few steps from where you live, often on a tight lot with limited access.

Sequence Matters More Than Speed

ADU construction cannot be rushed by working in parallel. The foundation has to pass before framing starts, and rough-in has to pass before walls are closed. A missed inspection window idles a crew; a missed order stalls the finishes.

Planning Before Mobilising

Before a crew arrives we locate utilities, confirm access for equipment, order long-lead materials and map inspection points against the calendar.

Why That Protects Your Budget

Idle crews, re-mobilisation and rush shipping are pure waste. Planning them out is the least glamorous and most valuable part of professional ADU construction.

Inspected At Every Stage

Every permitted ADU is inspected by the local building department as work proceeds. We schedule those inspections, walk each stage before calling them in, and keep the record for your files.

  • Foundation and underfloor inspections
  • Framing, shear and structural inspections
  • Electrical, plumbing and mechanical rough-in
  • Insulation and energy compliance checks
  • Final inspection and sign-off for occupancy
The Sequence

Six Stages Of Professional ADU Construction

Stage lengths vary with the type of unit and the site. The order never changes.

01

Site Preparation

Protection of the main house and yard, layout, excavation and utility trenching to the new unit.

02

Foundation

Forms, reinforcement and pour, designed to the soils conditions and structural drawings for your lot.

03

Framing & Roof

Walls, floor and roof structure go up and the unit takes its real shape for the first time.

04

Rough-In

Electrical, plumbing and mechanical systems routed and inspected before anything is covered.

05

Envelope & Interiors

Windows, doors, insulation, drywall, cabinetry, tile, flooring and fixtures installed.

06

Final Inspection

Punch list completed, final sign-off obtained and the keys handed over with warranty documents.

Included In Scope

What Our ADU Construction Service Includes

One contract covering the trades, inspections and coordination an accessory dwelling unit actually requires.

Site Work & Utilities

Excavation, trenching and new connections for sewer, water, power and gas where needed.

Engineered Foundations

Slab or raised foundation designed for your soils and structural requirements.

Expert Framing & Roofing

Framing, sheathing and roofing built to the structural drawings and inspected at each stage.

Electrical, Plumbing & HVAC

Systems sized for an independent home, including panel and meter work where required.

Energy & Insulation

Insulation, windows and systems that meet California Title 24 energy standards.

Premium Interior Finishes

Cabinetry, counters, tile, flooring and fixtures chosen in our Canoga Park showroom.

Quality Control

How We Keep ADU Construction On Track

The controls that keep scope, cost and schedule visible from the first trench to the final walkthrough.

A published schedule

You see what happens this week, what happens next, and which decisions we need from you and by when.

Change orders in writing

Every change is priced and approved before it is built. Nothing appears on a final invoice unseen.

Materials ordered early

Windows, cabinetry and fixtures are ordered against the schedule so they never hold up the trades.

One project manager throughout

The same person knows your drawings, permit status and selections from day one to handover.

Verifiable licensing

Licence CSLB #999603 — check it, and check any contractor you are considering for ADU construction.

Finished interior of the Los Alimos ADU construction project
Laundry and bedroom in the Los Alimos home
Living Through It

What ADU Construction Means For Your Household

Unlike most construction, an ADU is usually built while you live next to it. Planning for that is part of the job, not an afterthought.

Access And Staging

Materials, equipment and workers need a route to the back of the lot. We agree that route, where deliveries land and where materials are stored before work begins, so your driveway and garden are not improvised into a staging yard.

Utility Shutdowns

Connecting a new unit sometimes needs brief interruptions to water, power or gas in the main house. We schedule them in advance and keep them as short as practical.

Panel Upgrades

If the electrical service needs upgrading to carry a second home, coordination with the utility company happens early because it depends on their schedule, not ours.

Noise, Dust And Neighbours

Excavation and framing are the loudest stages. We work within permitted hours, keep the site contained and give neighbours notice before the noisiest work.

Keeping The Main House Livable

Protection for paths, landscaping and entrances stays in place throughout. Daily clean-up keeps the site safe for children and pets, and the work area is secured at the end of every day.

Built By Our Team

ADU Construction Projects Near You

Completed accessory dwelling units, each permitted, inspected and finished by our own crews.

Los Alimos ADU exterior under blue sky

ADU, Los Alimos

Completed accessory dwelling unit

Granada Hills ADU exterior with sliding glass doors

Detached ADU, Granada Hills

New unit with sliding glass doors

ADU design with open kitchen and living area in Los Angeles

Detached ADU, Los Angeles

Open kitchen and living area

Free On-Site Audit

Ready To Start ADU Construction?

Send your address and we will check utilities, access and site conditions, then give you a fixed, property-specific proposal instead of a guess.

Questions & Answers

ADU Construction Questions

How long does ADU construction take?

As a guide, garage conversions typically take three to five months to build and ground-up detached units five to eight months, depending on size, site conditions and inspection scheduling. You get a project-specific schedule after the audit.

Almost always, yes. Most ADU construction happens in the yard or garage, with only short, scheduled utility interruptions to the main house.

Specialist trades are part of any build. What matters is that one project manager of ours coordinates and supervises every one of them, and that we stay accountable for the result.

We explain it, price it and agree the fix with you in writing before continuing. The on-site audit exists to reduce these surprises in the first place.

Yes. Every permitted unit is inspected at foundation, framing, rough-in, insulation and final stages. We schedule each inspection and walk the work before calling it in.

We handle ADU construction throughout Los Angeles, the San Fernando Valley, Sherman Oaks, Encino, Tarzana, Woodland Hills, Calabasas, Westlake, Pasadena, Glendale, Culver City, the South Bay, Santa Clarita Valley, Ventura County, Thousand Oaks, Beverly Hills, West Hollywood, Santa Monica, Malibu, Agoura Hills, Simi Valley, Burbank, Granada Hills, Canoga Park, Reseda and the surrounding areas.

Choosing A Contractor

Questions To Ask Before You Hire Anyone

Whoever you end up hiring, these questions separate a professional operation from an optimistic one. Ask them of us, and ask them of everyone else you are considering.

Licensing And Insurance

Ask for the licence number and look it up. Ask who carries liability and workers’ compensation insurance for the people on your property. A reputable builder answers both without hesitation.

Who Actually Runs The Site

Find out whether the person who sold you the project will ever visit it. You want a named project manager who knows the drawings and will be there at every inspection.

A Warning Sign

If nobody can tell you who supervises the trades day to day, nobody does.

How Pricing Really Works

Ask what is included, what sits in allowances and what is excluded. A low number that leaves out utility connections, permit fees or site work is not a low number at all.

  • Is the proposal specific to my property?
  • How are changes priced and approved?
  • When are payments due, and against which milestones?

What Happens After Handover

Ask what warranty documentation you receive, how snags are handled and who you call in the first year. The answer tells you how a company expects to be judged.

Real Homeowners

Homeowner Experiences

Hear directly from Southern California clients who trusted H&A My Design with their custom homes, ADUs, and additions.

H&A My Design homeowner video review by Jhamal, Los Angeles
Rated 5 out of 5

Walk the finished home — navy kitchen with brass fittings, an open living space and a new double-vanity bathroom.

Jhamal — Verified Homeowner
Kitchen, Living & Bath Remodel • Los Angeles, CA
H&A My Design homeowner video review by Erik, Thousand Oaks
Rated 5 out of 5

“We’re extremely happy with the results. Without a shadow of doubt, we’ve already recommended them to other neighbors.”

Erik — Verified Homeowner
Whole-Home Gut Renovation • Thousand Oaks, CA
H&A My Design homeowner video review by Elizabeth, Malibu
Rated 5 out of 5

“Everybody was phenomenal to work with, a pleasure to have. Totally fair and wonderful company and great family.”

Elizabeth — Verified Homeowner
Home Renovation • Malibu, CA
Client testimonial video 1
Rated 5 out of 5

“H&A made the entire process transparent. Having one GC manage blueprints, city permits, and the build was night and day.”

Verified Homeowner
Detached ADU Build • Los Angeles, CA
Client testimonial video 2
Rated 5 out of 5

“Their Canoga Park showroom made selecting our cabinets, quartz, and fixtures so easy. Finished right on schedule.”

Verified Homeowner
Whole Home Remodel • Encino, CA
Client testimonial video 3
Rated 5 out of 5

“Converted our garage into a 2-bedroom rental. Flawless craftsmanship and leased immediately after final inspection.”

Verified Homeowner
Garage ADU Conversion • Sherman Oaks, CA
H&A My Design homeowner video review by Ryan, Torrance
Rated 5 out of 5

See the full before and after — the original kitchen, the opened-up living space and the finished bathrooms.

Ryan — Verified Homeowner
Kitchen & Bath Remodel • Torrance, CA
Client testimonial video 5
Rated 5 out of 5

“From 3D plans to final city sign-off, H&A handled everything. No surprise change orders, no stress.”

Verified Homeowner
Complete Renovation • Pasadena, CA
Client testimonial video 6
Rated 5 out of 5

“Built a modern ADU for my parents. The accessibility and aesthetic details exceeded all our expectations.”

Verified Homeowner
Multigen ADU • Culver City, CA
Service Coverage

Serving Southern California

Licensed throughout Los Angeles & Ventura Counties. HQ Showroom at 6723 Variel Ave, Canoga Park, CA.

Your Property Can Do More

MORE SPACE.
MORE VALUE.

Design, permits, showroom selections, and master construction—managed by one accountable team.

Scroll to Top
Direct General Contractor Access

Start Your Design-Build Project

Speak directly with our General Contractor for a complimentary site review and fixed proposal.

Urgent questions? Call our office directly at 800-285-3002.