Licensed & Bonded Call 800-285-3002 Today Get A Free 3D Design 5,000+ Sq. Ft. Showroom Award Winning Builders Near You
Approvals Handled In-House

Professional ADU Permits Handled For You

ADU permits are where most backyard projects lose time. H&A My Design prepares the submittal, answers plan-check corrections and schedules every inspection as a licensed California general contractor (CSLB #999603), family-owned for more than 20 years. Serving Southern California and the surrounding areas.

Permit strategy reviewed before drawings are finalised — so the set goes in complete the first time.

The Reality

What Getting ADU Permits Actually Involves

California has made accessory dwelling units far easier to approve than they used to be, but approval still depends on a complete, coordinated drawing set and fast, accurate answers to the city’s questions. That is where projects either move quickly or stall for months.

Why State Law Helps

Under the current state ADU guidance, a compliant ADU application is reviewed against objective standards rather than discretionary hearings, and local agencies must act on a complete application within a set period.

The Word That Matters: Complete

The clock only runs on a complete application. An incomplete set earns a correction list instead of an approval, which is why we file full packages rather than partial ones.

Why ADU Permits Still Take Time

Review times vary by city. In our experience they typically run from about 6 to 14 weeks, depending on the department, its workload and how quickly corrections are answered.

  • Incomplete submittals that invite a first-round rejection
  • Slow responses to plan-check correction lists
  • Separate consultants who do not coordinate their answers
  • Utility or fire clearances started too late
The Path

How We Secure ADU Permits Step By Step

Six stages from the first check to the final inspection sign-off.

01

Pre-Check

Zoning, setbacks, easements, special overlays and the reviewing department confirmed for your address.

02

Complete Submittal

Architectural, structural and Title 24 documents filed as one coordinated package.

03

Plan Check

Reviewers check the set against building, zoning, fire and energy requirements.

04

Corrections

Comments answered by the team that drew the set, then resubmitted promptly.

05

Issuance

Fees paid and the permit issued, ready for construction to begin.

06

Inspections & Final

Every stage inspected on site through to final sign-off.

What Goes In

What An ADU Permit Set Contains

A complete set is the single biggest factor in how quickly ADU permits are issued.

Site Plan

The unit on the lot with setbacks, easements, access and utility routes.

Floor Plans & Elevations

Dimensioned layouts and every face of the building with heights and materials.

Structural Engineering

Foundation, framing and connection details prepared with the project engineer.

Title 24 Energy Report

Documentation showing the unit meets California energy standards.

Utility & Sewer Details

Connection routes and capacity for sewer, water and electrical service.

Fire & Access Details

Access paths, separations and any fire requirements for the site.

Why Use Us

A Trusted Partner For ADU Permits Near You

Homeowners can apply for their own permits. Most find that coordination, not paperwork, is what defeats them.

We are the licensed applicant

As a licensed general contractor (CSLB #999603) we file, respond and schedule on your behalf.

One team answers corrections

The people who drew the set answer the comments on it, so responses go back complete.

Clearances tracked together

Utility, sewer and fire clearances are managed alongside the building permit, not after it.

Realistic expectations

You get an honest timeline for your city rather than a best-case figure designed to win the job.

Los Angeles ADU built under approved ADU permits
Bathroom in the Los Angeles ADU
Local Knowledge

How ADU Permits Behave Across Southern California

The same unit can face different requirements two streets apart. These are the local realities worth understanding before you set a start date.

Every City Runs Its Own Department

Property inside the City of Los Angeles is reviewed by LADBS. Burbank, Glendale, Pasadena, Santa Monica, Culver City, Thousand Oaks and unincorporated county areas each run their own departments, forms and queues.

Special Zones Add Review

Hillside areas, coastal zones, historic districts and fire hazard severity zones can each add requirements. We identify them at the pre-check rather than discovering them mid-process.

Fire Hazard Areas

Properties in designated fire zones may need specific materials, access or sprinkler provisions depending on the site and the main house.

Fees

Plan check and permit fees are set locally. State law limits impact fees on smaller ADUs, and we identify which fees apply to your project during planning so there are no surprises.

Existing Unpermitted Units

If a unit already exists without permits, California provides routes to bring some of them into compliance. We can review what is on your property and explain whether legalising it is realistic.

After Approval

What Happens Once ADU Permits Are Issued

Issuance is a milestone, not the finish line. Permits carry obligations right through construction.

Inspections Set The Pace

Foundation, framing, rough-in, insulation and final inspections all sit on the critical path. We book them early and walk each stage before calling the inspector.

Permits Can Expire

An issued permit lapses if work does not start or inspections stop for too long. Keeping the job moving is a compliance matter as much as a scheduling one.

Revisions On Site

If something changes during construction, revised drawings may need to be filed. We handle that rather than hoping it goes unnoticed at final inspection.

Final Sign-Off

Final inspection confirms the unit is complete and legally habitable. An unclosed permit can surface years later during a sale, so we close every one properly at handover.

Records For Your Files

You receive the approved plans and inspection record, which matter for insurance, refinancing and eventual resale.

Permitted And Built

ADU Projects We Took Through Plan Check

Each of these required a full submittal, correction responses and a sequence of inspections before handover.

Detached ADU home construction exterior in Los Angeles

Detached ADU, Los Angeles

Ground-up backyard unit

Open kitchen and living area in a Granada Hills home

Detached ADU, Granada Hills

Open kitchen and living area

Kitchen in the Culver City garage conversion ADU

Garage Conversion ADU, Culver City

Permitted conversion

Free Pre-Check

Need ADU Permits Without The Headache?

Send us your address and, if you have them, any drawings. We will tell you which department reviews your project, what approvals apply and what a realistic timeline looks like.

Questions & Answers

ADU Permit Questions

How long do ADU permits take?

It varies by city and by how complete the submittal is. In our experience review typically takes about 6 to 14 weeks, and we give you the realistic expectation for your jurisdiction.

We do. H&A My Design handles the submittal, plan-check corrections and inspection scheduling as part of your project.

Fees are set by the local department and depend on the size and value of the unit. State law limits impact fees on smaller units. We identify which fees apply during planning.

No structural work can begin without an issued permit. We plan the schedule around issuance rather than betting on it.

Sometimes. We review what is on the property, what would need to change and whether the route is realistic before recommending it.

Throughout Los Angeles, the San Fernando Valley, Sherman Oaks, Encino, Tarzana, Woodland Hills, Calabasas, Westlake, Pasadena, Glendale, Culver City, the South Bay, Santa Clarita Valley, Ventura County, Thousand Oaks, Beverly Hills, West Hollywood, Santa Monica, Malibu, Agoura Hills, Simi Valley, Burbank, Granada Hills, Canoga Park, Reseda and the surrounding areas.

Avoiding Delays

Common Reasons ADU Applications Get Corrections

Most correction lists repeat the same handful of issues. Getting them right the first time is the fastest way through plan check.

Setbacks And Separations

Distances to property lines, the main house and other structures must be measured accurately and shown clearly. Small errors here are the most common reason a set comes back.

Missing Utility Information

Reviewers need to see how sewer, water and power reach the unit and that capacity exists. We survey these routes on site before drawing them.

Energy Report Mismatches

The Title 24 report must match the windows, insulation and equipment shown on the drawings. When they are prepared by separate firms, they often drift apart.

Structural Details

Connections, hold-downs and foundation details must be complete and consistent with the calculations. Our engineer and drafting team coordinate them before submittal.

Real Homeowners

Homeowner Experiences

Hear directly from Southern California clients who trusted H&A My Design with their custom homes, ADUs, and additions.

H&A My Design homeowner video review by Jhamal, Los Angeles
Rated 5 out of 5

Walk the finished home — navy kitchen with brass fittings, an open living space and a new double-vanity bathroom.

Jhamal — Verified Homeowner
Kitchen, Living & Bath Remodel • Los Angeles, CA
H&A My Design homeowner video review by Erik, Thousand Oaks
Rated 5 out of 5

“We’re extremely happy with the results. Without a shadow of doubt, we’ve already recommended them to other neighbors.”

Erik — Verified Homeowner
Whole-Home Gut Renovation • Thousand Oaks, CA
H&A My Design homeowner video review by Elizabeth, Malibu
Rated 5 out of 5

“Everybody was phenomenal to work with, a pleasure to have. Totally fair and wonderful company and great family.”

Elizabeth — Verified Homeowner
Home Renovation • Malibu, CA
Client testimonial video 1
Rated 5 out of 5

“H&A made the entire process transparent. Having one GC manage blueprints, city permits, and the build was night and day.”

Verified Homeowner
Detached ADU Build • Los Angeles, CA
Client testimonial video 2
Rated 5 out of 5

“Their Canoga Park showroom made selecting our cabinets, quartz, and fixtures so easy. Finished right on schedule.”

Verified Homeowner
Whole Home Remodel • Encino, CA
Client testimonial video 3
Rated 5 out of 5

“Converted our garage into a 2-bedroom rental. Flawless craftsmanship and leased immediately after final inspection.”

Verified Homeowner
Garage ADU Conversion • Sherman Oaks, CA
H&A My Design homeowner video review by Ryan, Torrance
Rated 5 out of 5

See the full before and after — the original kitchen, the opened-up living space and the finished bathrooms.

Ryan — Verified Homeowner
Kitchen & Bath Remodel • Torrance, CA
Client testimonial video 5
Rated 5 out of 5

“From 3D plans to final city sign-off, H&A handled everything. No surprise change orders, no stress.”

Verified Homeowner
Complete Renovation • Pasadena, CA
Client testimonial video 6
Rated 5 out of 5

“Built a modern ADU for my parents. The accessibility and aesthetic details exceeded all our expectations.”

Verified Homeowner
Multigen ADU • Culver City, CA
Service Coverage

Serving Southern California

Licensed throughout Los Angeles & Ventura Counties. HQ Showroom at 6723 Variel Ave, Canoga Park, CA.

Your Property Can Do More

MORE SPACE.
MORE VALUE.

Design, permits, showroom selections, and master construction—managed by one accountable team.

Scroll to Top
Direct General Contractor Access

Start Your Design-Build Project

Speak directly with our General Contractor for a complimentary site review and fixed proposal.

Urgent questions? Call our office directly at 800-285-3002.