Our Methodology

The H&A My Design Process, Stage By Stage

The H&A My Design process is a single, structured design-build roadmap from the first lot survey to the final key handover, with design, engineering, permits and construction under one contract. We are a licensed design-build general contractor, family-owned for more than 20 years. Serving Southern California and the surrounding areas.

Licensed & bonded California general contractor — CSLB #999603. One team from the first sketch to the last inspection.

Why It Matters

What A Design-Build Process Actually Means

In a traditional project you hire an architect, then an engineer, then shop the drawings around to contractors and hope the numbers match the design. A design-build process puts all of that under one roof, so the people drawing the house are the same people pricing it and building it.

One Contract, One Team

In the H&A My Design process, design, engineering coordination, permit expediting and construction sit under a single agreement with a single point of accountability. When a question comes up on site, nobody has to work out whose problem it is.

Budget Tested While You Design

Because the builder is in the room during design, cost is checked as the drawings develop rather than discovered after the permit is issued.

Fewer Gaps Between Trades

Drawings, structure and finishes are coordinated by one team, which removes the most common source of change orders.

Design-Build Versus Design-Bid-Build

The difference between the two approaches shows up in a handful of practical places:

  • Who is responsible when the drawings and the site disagree
  • When you find out what the project will really cost
  • How many contracts, schedules and invoices you manage
  • How quickly a design change can be priced and approved
  • Whether the builder helped shape the plan or inherited it
At A Glance

The H&A My Design Process At A Glance

The H&A My Design process runs in six stages, from spatial discovery to final key handover.

01

Discovery

Lot survey, utility check, zoning analysis and setback verification.

02

Architecture

3D renderings, floor plans, ceiling heights and finishes refined before permits.

03

Engineering

Structural drafting, foundation engineering and Title 24 energy packets.

04

Selections

City approvals expedited while you choose finishes in our showroom.

05

Construction

In-house framing, MEP trades and carpentry, inspected at every milestone.

06

Completion

Final sign-off, punch list, key handover and warranty activation.

Stage 01 · Discovery

Lot Feasibility And Spatial Audit

Every project starts on site, not on a screen. Before anything is drawn, we confirm what the lot and the local code will actually allow you to build.

What We Check

An on-site survey establishes the real starting point for the project:

  • Lot survey and existing structures
  • Utility locations and capacity
  • Zoning designation and what it permits
  • Setbacks, height limits and easements
  • Maximum allowable build dimensions

What You Come Away With

A clear picture of what is possible on your property and a realistic direction for the project, before design time is spent on something the city would never approve.

Your Decisions At This Stage

Priorities, a working budget range and how you plan to use the space. Those answers shape everything drawn in the next stage.

Stage 02 · Architecture

3D CAD Architectural Modeling

This is the stage most homeowners enjoy, and the one where changes are cheapest. Walls move on screen for free; on site they do not.

Seeing It Before It Exists

You walk through photorealistic 3D renderings of the interior and exterior, then refine the plan until it fits the way you live:

  • Floor plan layout and circulation
  • Ceiling heights and room volumes
  • Window placement and natural light
  • Exterior massing and materials
  • Early direction on finishes

Why Changes Belong Here

Every decision settled at this stage of the H&A My Design process is one that does not have to be reversed during construction. An extra week on the drawings is far cheaper than a month of undoing framing.

Blueprint Credit For ADUs

On qualified ADU design-build projects, the blueprint work can be credited toward construction. See the ADU blueprint offer for the terms.

Stage 03 · Engineering

Structural Plans And Energy Calculations

Once the design is settled, it becomes a set of documents that a building department can approve and a crew can build from.

The Permit Set

Engineering turns the design into buildable, approvable drawings:

  • Full structural drafting
  • Foundation engineering
  • Title 24 energy compliance packet
  • Drawings prepared for plan-check submittal

Why It Is Worth Getting Right

Structural calculations and energy compliance are where a plan either holds together or unravels at plan check. Getting them right the first time is quicker than working through a long list of corrections. California’s energy standards are published by the California Energy Commission.

Stage 04 · Selections

Permit Expediting And Showroom Curation

Two things happen side by side at this stage: the city reviews the plans and you choose the finishes. Running them in parallel is one of the quiet advantages of a design-build process.

Permits, Handled Personally

We personally expedite city approvals: submitting the plans, answering plan-check corrections and keeping the file moving. Permit review typically takes around six to fourteen weeks, depending on the jurisdiction and the scope of work.

Finishes, Chosen In Person

While the permit is in review, you specify cabinetry, stone, tile and plumbing fixtures in our 5,000 sq. ft. showroom at 6723 Variel Avenue, Canoga Park.

Why Selections Come Before Construction

Tile decides the substrate and cabinetry decides the plumbing rough-in. Locking selections early keeps the build from stopping to wait for a decision.

Stage 05 · Construction

Master Construction And Inspections

With permits issued and selections locked, construction follows the approved plans in the right order, inspected at every milestone.

Who Builds It

Dedicated in-house framing, MEP trades and custom carpentry, coordinated by the same team that designed and permitted the project:

  • Site preparation and foundation
  • Framing and structure
  • Mechanical, electrical and plumbing rough-in
  • Insulation, drywall and finishes
  • Custom carpentry and fixtures

Inspections At Every Milestone

City inspections are passed at each milestone before the next stage begins, so nothing is covered up until it has been signed off. As a guide, garage-conversion ADUs typically take three to five months to build, detached ADUs five to eight, and major additions five to eight.

Changes During Construction

If something changes, it is written up with its cost and schedule impact and approved by you before the work goes ahead.

Stage 06 · Completion

Final Sign-Off And Key Handover

In the H&A My Design process, a project is finished when the city signs it off and the house works the way it was designed to — not simply when the last trade leaves.

What Completion Covers

The final stage closes out the project properly:

  • Final city inspection and sign-off
  • Certificate of occupancy where the project requires one
  • Final quality punch list, walked together
  • Key handover
  • Activation of your warranty

After The Keys

Warranty terms are set out in your contract and activated at handover, together with the manufacturer documentation for the appliances and fixtures installed in your home.

On A Real Project

Before, During And After In West Hills

Three moments from one of our full-house renovation and addition projects.

West Hills home rear exterior before the renovation and addition

Before

The existing house

Structural remodeling and framing in progress at the West Hills project

During

Framing and structure

Rear exterior and pool after the West Hills renovation and home addition

After

Renovation and addition complete

What Keeps It On Track

How The H&A My Design Process Stays On Schedule

Five habits that separate a project that finishes from one that stalls.

One point of contact

You deal with one team from the first survey to the final walkthrough.

A written scope before work starts

Scope, allowances and schedule agreed in writing before demolition.

Selections locked early

Finishes chosen during permit review, not in the middle of construction.

Changes approved in writing

Every change is priced and approved before it is built.

Inspections passed at every milestone

Nothing is covered up until it has been signed off.

Framing built to the approved addition design during the design-build process at the West Hills project
Family room and dining area in the West Hills renovation, built through the H&A My Design process
Free Consultation

Start With Stage One

Book a site visit and we will walk your property, check what the lot allows and explain how the H&A My Design process would run for your project.

Questions & Answers

H&A My Design Process Questions

How long does the whole process take?

It depends on the scope and the jurisdiction. Permit review typically takes around six to fourteen weeks. Garage-conversion ADUs typically take three to five months to build, detached ADUs and major additions five to eight. You receive a written schedule once the scope is defined.

Yes. We can build from existing drawings, although you give up some of the cost and coordination benefits of a full design-build process.

Yes. We prepare the submission, expedite it with the city, answer plan-check corrections and schedule every inspection.

During stage four, while the permit is in review, in our Canoga Park showroom. Choosing early keeps construction from stopping to wait for decisions.

Changes are possible. Each one is written up with its cost and schedule impact and approved by you before work goes ahead.

Throughout Los Angeles, the San Fernando Valley, Sherman Oaks, Encino, Tarzana, Woodland Hills, Calabasas, Westlake, Pasadena, Glendale, Culver City, the South Bay, Santa Clarita Valley, Ventura County, Thousand Oaks, Beverly Hills, West Hollywood, Santa Monica, Malibu, Agoura Hills, Simi Valley, Burbank, Granada Hills, Canoga Park, Reseda and the surrounding areas.

Real Homeowners

Homeowner Experiences

Hear directly from Southern California clients who trusted H&A My Design with their custom homes, ADUs, and additions.

H&A My Design homeowner video review by Jhamal, Los Angeles
Rated 5 out of 5

Walk the finished home — navy kitchen with brass fittings, an open living space and a new double-vanity bathroom.

Jhamal — Verified Homeowner
Kitchen, Living & Bath Remodel • Los Angeles, CA
H&A My Design homeowner video review by Erik, Thousand Oaks
Rated 5 out of 5

“We’re extremely happy with the results. Without a shadow of doubt, we’ve already recommended them to other neighbors.”

Erik — Verified Homeowner
Whole-Home Gut Renovation • Thousand Oaks, CA
H&A My Design homeowner video review by Elizabeth, Malibu
Rated 5 out of 5

“Everybody was phenomenal to work with, a pleasure to have. Totally fair and wonderful company and great family.”

Elizabeth — Verified Homeowner
Home Renovation • Malibu, CA
Client testimonial video 1
Rated 5 out of 5

“H&A made the entire process transparent. Having one GC manage blueprints, city permits, and the build was night and day.”

Verified Homeowner
Detached ADU Build • Los Angeles, CA
Client testimonial video 2
Rated 5 out of 5

“Their Canoga Park showroom made selecting our cabinets, quartz, and fixtures so easy. Finished right on schedule.”

Verified Homeowner
Whole Home Remodel • Encino, CA
Client testimonial video 3
Rated 5 out of 5

“Converted our garage into a 2-bedroom rental. Flawless craftsmanship and leased immediately after final inspection.”

Verified Homeowner
Garage ADU Conversion • Sherman Oaks, CA
H&A My Design homeowner video review by Ryan, Torrance
Rated 5 out of 5

See the full before and after — the original kitchen, the opened-up living space and the finished bathrooms.

Ryan — Verified Homeowner
Kitchen & Bath Remodel • Torrance, CA
Client testimonial video 5
Rated 5 out of 5

“From 3D plans to final city sign-off, H&A handled everything. No surprise change orders, no stress.”

Verified Homeowner
Complete Renovation • Pasadena, CA
Client testimonial video 6
Rated 5 out of 5

“Built a modern ADU for my parents. The accessibility and aesthetic details exceeded all our expectations.”

Verified Homeowner
Multigen ADU • Culver City, CA
Service Coverage

Serving Southern California

Licensed throughout Los Angeles & Ventura Counties. HQ Showroom at 6723 Variel Ave, Canoga Park, CA.

Your Property Can Do More

MORE SPACE.
MORE VALUE.

Design, permits, showroom selections, and master construction—managed by one accountable team.

Scroll to Top
Direct General Contractor Access

Start Your Design-Build Project

Speak directly with our General Contractor for a complimentary site review and fixed proposal.

Urgent questions? Call our office directly at 800-285-3002.